IADC Supervisors Well Control - Surface / Subsea
Recommended for personnel active in any operational or engineering role including well site supervisory and office based roles involved in drilling and work over operations such as OIMs, Drilling Superintendents, Drilling Engineers, Drilling Supervisors, Toolpushers, and Drillers.
The IADC Supervisors Well Control course provides candidates with an advanced understanding of well control principals, practices and equipment to gain necessary knowledge required to apply safe Well Control practices in surface and subsea installations.
Emphasis on policies and specific procedures will form a major part of the course structure.
A combination of theory, discussion, and practical simulator exercises are used to optimise learning, and needs of individual candidates are identified and addressed to ensure all participants reach their potential.
Some of the many benefits of this course:
- Extended time spent on Well Control Equipment functionality and problem solving.
- A clear understanding of varying wellbore pressures during well kill operations.
- Reduced class numbers to ensure extended hands-on ‘Choke Time’ for each candidate to enhance familiarity and competence.
Candidates will be required to sit a computerised theory assessment and a practical simulator assessment. Candidates must achieve 70% in both assessment components to be successfully certified. The certificate is valid for 2 years.
- Well Control Procedures and Responsibilities
- Pressure Regimes – Subnormal, Normal and Abnormal
- Primary Well Control
- Formation Fracture Pressure - LOT/FIT, MAASP (static and dynamic), MAMW.
- SCR’s and CLFL’s
- Annular Pressure Losses / ECD
- Top Hole Drilling / Shallow Gas / Diverting / Riserless Drilling
- Causes of Kicks
- Kick Indicators and Warning Signs
- Gas Behaviour – Circulating, Migration and Solubility
- Secondary Well Control, Shut–in Procedures API RP59 and Company
- Permeability and Porosity
- Kill Methods - Drillers, Weight and Wait, Volumetric - Theory and Practical
- Other Kill Methods presented and explained
- Well Control Problems
- Impermeable Gas Cap
- Riser Margin, Riser Collapse
- Accumulator Unit – Components / Function / API RP 53
- Annular Preventers – Components / Function
- Ram Preventers / Locking Devices / Piston Rod Mud Seal, Opening and Closing Ratios, Ram Assemblies
- Subsea Marine Riser Assembly
- Indirect Hydraulic Subsea Bop System
- Minimum BOP Requirements - API RP53
- Mug Gas Separator / Liquid Mud Seal
- Safety Valves – FOSV, IBOP, Dart and Dart Sub, Float Valves
- Diverters
- Well Control Equipment – Minimum Closing Times and Testing Requirements - API RP53
- Well Integrity (two barriers)
Full lunch provided
Tea, Coffee, Water and Snacks provided for Morning and Afternoon Tea
All course materials are provided including the use of a tablet for each candidate
Free and secure parking
Courses
Latest News
Parking at Courses
Free and secure parking is available for all of our candidates.


